Dolby Road

Dolby Road FULHAM BriefClients bought a property in London, in need of a full house modernisation. A small basement was to be dug out, and a rear ground and first floor extension to be built, with a gallery room.Build Duration: 40 weeksDesign: BTL Design SolutionsThe basement was fully tanked. Transformed the wine cellar into a functional utility […]
Queensmill Road

Queensmill Road FULHAM BriefTransforming 2 flats in to a single modern house with basement, loft and pod converted, rear and side extended.Build Duration: 50 weeksDesign: Shape Architecture SolutionsWith rigorous planning we dug the basement first, which extended under the garden and side extension. We then built a loft-pod conversion, and put up scaffolding to enable the building […]
Chiddingstone

Chiddingstone FULHAM BriefProperty in need of a full refurbishment and additional rooms. To be built to an Italian theme with as much light as possible.Build Duration: 60 weeksDesign: BTL Design SolutionsWe combined traditional joinery techniques and hardwood finishes with high ceilings to a modern high spec throughout. We increased the number of rooms by building a side […]
Little Boltons

Little Boltons KENSINGTON BriefFull house refurbishment was required and an upgrade to the basement.Build Duration: 50 weeksDesign: Wilben SolutionsWe upgraded and extended the existing basement to include a terrace area. The property was then fully refurbished.ResultsA beautiful family home fully refurbished to create a warm modern living environment. Finishing TouchesThe property was finished to a high standard with […]
Trinity Road

Trinity Road WANDSWORTH BriefNew owners in need of a more spacious house. Full basement implementation, rear extension, small internal courtyard, cinema room, bar area, gym, utility room.Build Duration: 60 weeksDesign: Ade Architecture Ltd SolutionsWe dug out the basement, which extended the full width and length of the property. Added in an internal lightwell and several rooms to […]
Radipole Road

Radipole Road FULHAM BriefNew owner with a new vision, to accommodate a wine cellar and utility in a basement dig out, add an extension and create a gallery room.Build Duration: 50 weeksDesign: BTL Property & Melinda Swan SolutionsThe basement was dug out to include the extra rooms the client required. Then the first floor was completely demolished to create […]